installation notice
Please choose the open,smooth,solid ground to install this equipment, and make sure the safety of equipment.
The base frame installation
As shown in the pc1, the base consists of a center base and four supporting bases.
2) Put the center base on the smooth ground, and the four supporting bases side.
3) Use the angle support to connect the center base with other four supporting bases.
4) Every angle support has four bolts, and the specification is M16*30
5) The bolt is equipped with flat gasket, keep off loose
6)Please make sure the bolt is tight
Mast erection
1)this product has no special protection box.
2)take the mast out of the mast.
3)up the mast protection box, there is small protection box,it can be keep or take it down.
4)please put the mast on the center base by mechanical lifting equipment,and use four M16*40bolts to fix.
5)make sure the installation is solid and the mast is vertical to the ground.
3.poles installation
1)every piece is equipped with four poles and one crowbar.
2)The two ends of every pole have butt-joint block.
3)butt-joint block divides into up, down block; respectively connect the mast protection frame and the base.
4) Rectangular butt-joint block connect with the mast protection frame, and equipped with two bolts.
5)Square butt-joint block connect with the base, and equipped with four bolts.
6)make sure the connection is solid.
7)Use the crowbar to adjust the poles length and make it perfect.
4,main technical parameters
mast and protection frame
mast model:AZ11-270-3800-25000
initial height:3.8m
the max height:25m
material:aluminium alloy
payload:50Kg
operating temprature:-20°C~60°C
level of protection:IP64
the steady wind speed:8 grade wind;
limited wind speed:12 grade wind(need wind rope to fix);
oscillating quantity in steady wind speed:≤±300mm(17m/s wind speed);
torsion angle:±0.5°(torque less than 20Nm)
surface treatment:hard anodizing
surface color:dark brown
protection frame material:steel tube
surface treatment:galvanization and grey coating
system weight:380Kg
base assembly
center base size:1.2m * 1.2m
center base weight:72Kg
support base size:1.2m * 0.6m
supporting base weight:37Kg
material:steel tube and aluminium alloy checkered plate
system weight:270Kg
surface treatment:steel tube and grey coating
poles assembly
poles specification:Φ60*1930(mm)
NO:4pc
weight:90Kg
surface treatment:galvanization
Single set of equipment list
Product name | Component name | No | Remark |
Mast and protection frame | mast | 1 | |
frame | 1 | M10*25 hexagon bolt connection | |
Top frame | 1. | ||
foundation components | Center base | 1 | |
Supporting base | 4 | ||
Angle support | 8 | ||
Fastening bolt | 32 | M16*30,for supporting angle use | |
Fastening bolt | 4 | M16*40,for mast base use | |
Poles components | Pole upper butt-joint block | 4 | |
Pole down butt-joint block | 4 | ||
Adjusted pole | 4 | ||
Fastening bolt | 24 | M16*30 | |
Control box | 220Vsingle pump control box | 1 | |
Other components | Steel rope | 6 | 19m*3pcs;16m*3pcs |
Ground rope | 3 | 30*800 | |
Pole adjusted hank lever | 1 | ||
quotation |
Model | Section number | Initial height(mm) | The maximum increase(mm) | The outer diameter of the outermost section(mm) | The inner diameter of the innermost section(mm) | Load(Kg) | Mast weight(Kg) |
TZ6-150-2600-12000 | 6 | 2600 | 12000 | 160 | 60 | 70 | 310 |
TZ7-190-3000-15000 | 7 | 3000 | 15000 | 202 | 75 | 100 | 380 |
TZ8-215-3200-18000 | 8 | 3200 | 18000 | 229 | 75 | 100 | 420 |
TZ8-270-3500-20000 | 8 | 3500 | 20000 | 284 | 110 | 200 | 680 |